Completely reckless

Automatically saved draft

Nachrichten
12.10.2024 13:47

The clean-up work after the floods will continue in Vienna for another two to three weeks. But many Viennese don't care. A carelessness that can be dangerous. 

The Vienna River cycle path has been closed since the floods in September. Railings were torn away, signs knocked over and stones washed away. The clean-up work will take another "two to three weeks", the responsible department, MA 45 (Vienna Waterways), recently announced.

No control
Although the exits are blocked by barriers and marked with warning signs, many people ignore them. Cyclists and joggers are out and about on the river path between Auhof and Kennedybrücke, especially in good weather. Even families with children ride along here without a care in the world. So do pedal riders in the dark, who could crash into construction equipment at any time. The ban is obviously not enforced.

From October 15, Wiener Linien and the municipal authorities will begin repair work on the Wien River bed in the Pilgramgasse area. Because material is being lifted in, the Linke Wienzeile is narrowed to one lane. The work will last until December. The subway construction site has been severely damaged by the flood.

This article has been automatically translated,
read the original article here.

Loading...
00:00 / 00:00
Abspielen
Schließen
Aufklappen
kein Artikelbild
Loading...
Vorige 10 Sekunden
Zum Vorigen Wechseln
Abspielen
Zum Nächsten Wechseln
Nächste 10 Sekunden
00:00
00:00
1.0x Geschwindigkeit
Loading
Kommentare

Willkommen in unserer Community! Eingehende Beiträge werden geprüft und anschließend veröffentlicht. Bitte achten Sie auf Einhaltung unserer Netiquette und AGB. Für ausführliche Diskussionen steht Ihnen ebenso das krone.at-Forum zur Verfügung. Hier können Sie das Community-Team via unserer Melde- und Abhilfestelle kontaktieren.

Kostenlose Spiele
Vorteilswelt