Defect in the manhole cover

Heavy traffic jam in evening traffic in front of the Plabutsch tunnel

Nachrichten
28.11.2024 20:04
Porträt von Steirerkrone
Von Steirerkrone

In the middle of evening traffic, one lane of the A 9 Pyhrnautobahn in the Plabutschtunnel had to be closed for a short time. This was probably caused by a technical fault. As a result, there was a traffic jam in the southbound direction that stretched as far as the Gleinalm Tunnel.

Traffic chaos on the A 9 between St. Michael and Graz cost drivers a lot of nerves on Thursday evening. Apparently, the Plabutsch Tunnel in the southbound direction had to be closed due to a technical defect in a sewer - as a result, only one lane was passable.

Lane open again
The closure was lifted around 7 p.m., but the kilometer-long traffic jam was slow to clear. At times, a line of cars had formed all the way to the Gleinalm Tunnel.

This article has been automatically translated,
read the original article here.

Loading...
00:00 / 00:00
Abspielen
Schließen
Aufklappen
kein Artikelbild
Loading...
Vorige 10 Sekunden
Zum Vorigen Wechseln
Abspielen
Zum Nächsten Wechseln
Nächste 10 Sekunden
00:00
00:00
1.0x Geschwindigkeit
Nachrichten
28.11.2024 20:04
Loading
Kommentare Banner - Die Stimme Österreichs

Da dieser Artikel älter als 18 Monate ist, ist zum jetzigen Zeitpunkt kein Kommentieren mehr möglich.

Wir laden Sie ein, bei einer aktuelleren themenrelevanten Story mitzudiskutieren: Themenübersicht.

Bei Fragen können Sie sich gern an das Community-Team per Mail an forum@krone.at wenden.

Kostenlose Spiele
Vorteilswelt

Magazine der Kronen Zeitung