Two construction sites

Mega traffic jam at the Brenner Pass: highway closed since the morning

Nachrichten
12.10.2024 16:09

Anyone wanting to cross the Brenner Pass had to reckon with long delays on Saturday morning. Due to two roadworks, traffic was only moving in one lane. It took four hours to drive from Sterzing to Gries am Brenner and up to two hours southbound. 

On the Brenner highway, you had to be patient and have good nerves on Saturday. Around four hours were lost at times heading north, with traffic jams in the Wipptal valley, especially from the Obernberg bridge to Matrei am Brenner.

Here you can see the traffic jam (red).
Here you can see the traffic jam (red).(Bild: Screenshot Asfinag)

"There is no end in sight, but the situation has thankfully eased somewhat since the truck driving ban, which has been in place since 3 p.m.," the executive told the Tiroler Krone newspaper.

Zitat Icon

There is no end in sight, but the situation has thankfully eased somewhat since the truck driving ban came into force at 3 pm.

Die Polizei

The reason for the traffic jam is two roadworks, which means that the road can only be used in one lane in both directions at times. On the Luegbrücke bridge, roadworks are taking place and there is also a construction site at the border tunnel on the Brenner Pass.

This article has been automatically translated,
read the original article here.

Porträt von Tiroler Krone
Tiroler Krone
Loading...
00:00 / 00:00
Abspielen
Schließen
Aufklappen
kein Artikelbild
Loading...
Vorige 10 Sekunden
Zum Vorigen Wechseln
Abspielen
Zum Nächsten Wechseln
Nächste 10 Sekunden
00:00
00:00
1.0x Geschwindigkeit
Loading
Kommentare

Willkommen in unserer Community! Eingehende Beiträge werden geprüft und anschließend veröffentlicht. Bitte achten Sie auf Einhaltung unserer Netiquette und AGB. Für ausführliche Diskussionen steht Ihnen ebenso das krone.at-Forum zur Verfügung. Hier können Sie das Community-Team via unserer Melde- und Abhilfestelle kontaktieren.

Kostenlose Spiele
Vorteilswelt