After software problems

Two tunnels on the A10 towards Salzburg closed

Nachrichten
21.09.2024 18:18
Porträt von Salzburg-Krone
Von Salzburg-Krone

As if the holidaymakers' return traffic wasn't enough with the major tunnel renovation on the Tauernautobahn. Since 4.30 p.m. on Saturday, two tunnels have also been closed due to technical problems. There were major delays. The closure was lifted shortly before 7 pm.

According to information from the highway and tunnel operator Asfinag, there were problems with the software in the Hiefenauer and Ofenauer tunnels in the direction of Salzburg on the A10 and therefore probably with the display boards.

The diverted traffic caused traffic jams on the B159 in the afternoon
The diverted traffic caused traffic jams on the B159 in the afternoon(Bild: Google Maps)

As a result, the heavy summer return traffic heading towards Germany has been diverted since 4.30 pm. This resulted in long delays in some cases.

Shortly before 7 p.m., however, Asfiang gave the all-clear in response to an inquiry from "Krone": the software problems have been resolved and traffic is flowing unhindered again heading north - apart from the tunnel renovation.

This article has been automatically translated,
read the original article here.

Loading...
00:00 / 00:00
Abspielen
Schließen
Aufklappen
kein Artikelbild
Loading...
Vorige 10 Sekunden
Zum Vorigen Wechseln
Abspielen
Zum Nächsten Wechseln
Nächste 10 Sekunden
00:00
00:00
1.0x Geschwindigkeit
Nachrichten
21.09.2024 18:18
Loading
Kommentare Banner - Die Stimme Österreichs

Da dieser Artikel älter als 18 Monate ist, ist zum jetzigen Zeitpunkt kein Kommentieren mehr möglich.

Wir laden Sie ein, bei einer aktuelleren themenrelevanten Story mitzudiskutieren: Themenübersicht.

Bei Fragen können Sie sich gern an das Community-Team per Mail an forum@krone.at wenden.

Kostenlose Spiele
Vorteilswelt

Magazine der Kronen Zeitung