Until the summer

Tunnel closure in Zell am See from May 6

Nachrichten
03.05.2024 18:00
Porträt von Salzburg-Krone
Von Salzburg-Krone

As reported, the ceiling at the south portal of the Schmitt Tunnel, which is in danger of collapsing, has to be extensively renovated. The tunnel has to be completely closed for the work. Traffic will have to divert via the Zell urban area.

In the Thumersbach district, vehicles weighing 3.5 tons or more will be banned from driving. This is intended to keep out heavy traffic. This traffic will have to drive through the urban area or take a wide detour.

The closure is to last until June 29. According to the plan, both lanes should then be reopened in time for the summer vacation.

Loading...
00:00 / 00:00
Abspielen
Schließen
Aufklappen
kein Artikelbild
Loading...
Vorige 10 Sekunden
Zum Vorigen Wechseln
Abspielen
Zum Nächsten Wechseln
Nächste 10 Sekunden
00:00
00:00
1.0x Geschwindigkeit
Nachrichten
03.05.2024 18:00
Loading
Kommentare Banner - Die Stimme Österreichs

Da dieser Artikel älter als 18 Monate ist, ist zum jetzigen Zeitpunkt kein Kommentieren mehr möglich.

Wir laden Sie ein, bei einer aktuelleren themenrelevanten Story mitzudiskutieren: Themenübersicht.

Bei Fragen können Sie sich gern an das Community-Team per Mail an forum@krone.at wenden.

Kostenlose Spiele
Vorteilswelt

Magazine der Kronen Zeitung